About the Project
Project Limits
The project limits are on U.S. 6 from mile marker 2 (top of the hill) to approximately 800-feet north of Cutting Street, and on U.S. 95 from the Nye/Esmeralda County line to the U.S. 6 intersection.

Project History and Key Milestones
The current design reflects decades of project development, public input and changing infrastructure needs.

2003-2005 | Initial Project Development
Design initiated: paused due to underground voids and basements
2018 | Public Outreach
Public Meeting held to present improvements and gather feedback
2022-2024 | Design Reassessment
Consultant design advanced; project approach reassessed
2025 | Project Advancement
GCW, Inc. selected to continue design and proposed improvements
2019-2020 | Cost & Risk Review
Estimated cost reached $40M; funding and construction risks prompted a pause
2014-2016 | Project Reinitiated
Preliminary funding secured; safety, roadway, and drainage scope expanded
What we heard from the community.
-
Maintain reliable movement of freight and through traffic
-
Ensure efficient emergency response and incident management access
-
Optimize on-street parking and access to businesses
-
Address concerns about reducing four travel lanes to two
-
Improve vehicle turning movements and congestion
-
Increase pedestrian safety
-
Maintain downtown business access and deliveries
-
Minimize construction impacts
-
Improve drainage and reduce flooding
-
Preserve Tonopah's historic downtown character
Why is this Project Needed?
The Downtown Tonopah Safety and Multimodal Project addresses several key needs, including improving safety, modernizing aging infrastructure, enhancing pedestrian accessibility, and balancing regional highway traffic with the needs of the local community and downtown businesses.
Safety
-
Vehicle speeds through downtown
-
Pedestrian crossing exposure
-
Turning and access conflicts
Infrastructure
-
Aging pavement
-
Aging drainage system
-
ADA deficiencies
-
Aging water/sewer infrastructure

Walking & Accessibility
-
Inconsistent sidewalks
-
Long pedestrian crossings
-
Limited accessible connections
Downtown
-
Highway functions as both a regional route and Tonopah's Main Street
-
Need to balance through traffic/freight with local access and business
The purpose of the project is to improve safety, accessibility, and mobility along U.S. 6 and U.S. 95 through downtown Tonopah while reconstructing aging roadway, drainage, and utility infrastructure.