About the Project

Project Limits

The project limits are on U.S. 6 from mile marker 2 (top of the hill) to approximately 800-feet north of Cutting Street, and on U.S. 95 from the Nye/Esmeralda County line to the U.S. 6 intersection.

Downtown Tonopah project limits

Project History and Key Milestones

The current design reflects decades of project development, public input and changing infrastructure needs.

roadmap-full.png
map icon_1.png

2003-2005 | Initial Project Development

Design initiated: paused due to underground voids and basements

map icon_3.png

2018 | Public Outreach

Public Meeting held to present improvements and gather feedback

map icon_5.png

2022-2024 | Design Reassessment

Consultant design advanced; project approach reassessed

map icon_6.png

2025 | Project Advancement

GCW, Inc. selected to continue design and proposed improvements

map icon_4.png

2019-2020 | Cost & Risk Review

Estimated cost reached $40M; funding and construction risks prompted a pause

map icon_2.png

2014-2016 | Project Reinitiated

Preliminary funding secured; safety, roadway, and drainage scope expanded

What we heard from the community.
  • Maintain reliable movement of freight and through traffic

  • Ensure efficient emergency response and incident management access

  • Optimize on-street parking and access to businesses

  • Address concerns about reducing four travel lanes to two

  • Improve vehicle turning movements and congestion

  • Increase pedestrian safety

  • Maintain downtown business access and deliveries

  • Minimize construction impacts

  • Improve drainage and reduce flooding

  • Preserve Tonopah's historic downtown character

Why is this Project Needed?

​The Downtown Tonopah Safety and Multimodal Project addresses several key needs, including improving safety, modernizing aging infrastructure, enhancing pedestrian accessibility, and balancing regional highway traffic with the needs of the local community and downtown businesses.

blue shield icon representing safety_edi
Safety
  • Vehicle speeds through downtown

  • Pedestrian crossing exposure

  • Turning and access conflicts

icon representing infrastructure, include a road, pipes and gear, simplify it.jpg
Infrastructure
  • Aging pavement

  • Aging drainage system

  • ADA deficiencies

  • Aging water/sewer infrastructure

image showing a person walking on a crosswalk with a person in a wheelchair, make it very
Walking & Accessibility
  • Inconsistent sidewalks

  • Long pedestrian crossings

  • Limited accessible connections

clipart style icon showing downtown buildings, victorian_western style, with a street lamp
Downtown
  • Highway functions as both a regional route and Tonopah's Main Street

  • Need to balance through traffic/freight with local access and business

The purpose of the project is to improve safety, accessibility, and mobility along U.S. 6 and U.S. 95 through downtown Tonopah while reconstructing aging roadway, drainage, and utility infrastructure. 